The Slab
 |
Back |
 |
Front | |
This is it. The top, or front, depending on what it becomes, is in pretty good shape. The bottom, or back, is very rough. It's about 2 by 3 feet. All kind of dirt and loose bark to get rid of. Also, as Steve pointed out to me, the slab is used to 100 percent humidity and will need to adjust to Boise's 20 percent. It's a bit "punky," but that might change as it dries out. A bargain IMHO.